Residential building permit fees from the official Henrico County Department of Building Construction and Inspections. Value-based formula: $100 for the first $5,000 of construction cost, plus $6 per additional $1,000 or fraction thereof, with a $680 maximum. Fee page last updated December 2025 on henrico.gov.

Jurisdiction
Henrico County, VA
Fee Structure
Value-based ($100 + $6/$1,000 over $5,000)
Maximum Fee
$680 per residential permit
Coverage Scope
Building permit only - trade permits separate
Last Verified
April 16, 2026
Fee Status
Official formula, page updated December 2025
What This Page Covers - and What It Does Not

This page covers: Henrico County residential building permit fees for existing one- and two-family dwellings (decks, porches, sheds, garages, swimming pools, demolitions, additions, and other appurtenances) and new one- and two-family dwelling construction, as published on the official Henrico County permit fee page. Also covers the Virginia USBC state levy (2%) applied to all permits, and trade permit fee formulas for electrical, mechanical, and plumbing work.

This page does NOT cover: Commercial building permits (separate $7/$1,000 formula with no cap); multi-family construction; inspection surcharge fees (new construction only, $75 per inspection over average); temporary certificate of occupancy fees; plan amendment fees; zoning or variance fees from other departments; or fees from the Henrico County Health Department, Planning Department, or Public Works.

Note on effective date: The Henrico County permit fee page at henrico.gov/bldg/permit-fees/ is labeled "Current" and was last updated December 17, 2025. No explicit fiscal year effective date is stated on the page. The fee formula is consistent with the residential permit page updated March 2026. Verify current rates with Building Inspections before filing.

Key Takeaways
  • Residential building permits for existing homes follow a value-based formula: $100 base (covers up to $5,000 in construction value) plus $6 per $1,000 of additional value or fraction thereof.
  • The maximum residential building permit fee is $680, reached at approximately $101,667 in construction value. Any project above that threshold pays the same $680 cap.
  • New one- and two-family dwelling construction is a flat $680 building permit fee regardless of the home's value. Trade permits for new construction are a flat $100 each.
  • Electrical, mechanical, and plumbing trade permits for existing residential work follow the same value-based formula as the building permit ($100 + $6/$1,000 over $5,000).
  • All permits are subject to Virginia's mandatory 2% USBC state levy applied to the permit fee. Total = permit fee + (permit fee x 2%).
  • No separate plan review fee is listed for residential permits - the building permit fee appears to be all-in for the building department's review and inspection costs.

Henrico County Residential Building Permit Fee Schedule

All fees listed are the building permit fee before the 2% USBC state levy. Add 2% to each permit fee at payment. Source: henrico.gov/bldg/permit-fees/ (last updated December 2025).

Project Category Formula Example: $15,000 Project Example: $50,000 Project
New one- or two-family dwelling (new construction) Flat $680 $680.00 $680.00
Existing residential - any appurtenance
Decks, porches, sheds, garages, pools, additions, demolitions
$100 + $6/$1k over $5k
Max $680
$160.00 $370.00
Electrical permit (existing residential) $100 + $6/$1k over $5k $160.00 $370.00
Mechanical permit (existing residential) $100 + $6/$1k over $5k $160.00 $370.00
Plumbing permit (existing residential) $100 + $6/$1k over $5k $160.00 $370.00
Electrical permit (new construction) Flat $100 $100.00 $100.00
Mechanical permit (new construction) Flat $100 $100.00 $100.00
Plumbing permit (new construction) Flat $100 $100.00 $100.00

Note: Add 2% USBC state levy to each permit fee at payment. Example: $160 building permit x 1.02 = $163.20 total. Source: henrico.gov/bldg/permit-fees/, last updated December 17, 2025. No explicit fiscal year effective date is stated on the source page.

How Henrico County Calculates Building Permit Fees

Methodology - Henrico County Residential Building Permit
Step What Happens Henrico County Rule
1. Determine construction value The fee is based on the estimated cost of labor and materials for the project. You declare this value at application. Building Inspections uses your declared construction value to calculate the permit fee. Undervaluing the project may trigger fee adjustments during review.
2. Apply the base fee The first $5,000 of construction value is covered by a flat $100 base fee. No additional fee accrues below $5,000. All existing residential permits: $100 minimum regardless of project value.
3. Add the per-$1,000 increment For every $1,000 of construction value above $5,000, add $6. Fractions of $1,000 are rounded up to the next full $1,000. $6 per $1,000 or fraction thereof over $5,000. Example: $15,000 project has $10,000 over threshold = 10 increments x $6 = $60.
4. Apply the $680 maximum The building permit fee cannot exceed $680 for one- and two-family residential permits. The cap is reached at approximately $101,667 in construction value. Fee = min($100 + ($6 x increments), $680). At $110,000: $100 + ($6 x 105) = $730 - capped at $680.
5. Add USBC state levy Virginia's mandatory 2% levy is applied to the permit fee. Total owed = permit fee + (permit fee x 0.02). Example: $160 permit fee x 1.02 = $163.20 total. The levy is calculated and paid separately per permit.
6. Identify required trade permits Electrical, mechanical, and plumbing permits are separate from the building permit. For existing residential work, they use the same formula. For new construction, each is a flat $100. Each trade permit also carries the 2% state levy. Pull trade permits as needed - a deck requiring electrical work needs both a building permit and an electrical permit.

Fee at Different Construction Values (Existing Residential)

Construction Value Building Permit Fee 2% State Levy Total to Pay
$5,000 or less $100.00 $2.00 $102.00
$8,000 $118.00 $2.36 $120.36
$15,000 $160.00 $3.20 $163.20
$25,000 $220.00 $4.40 $224.40
$30,000 $250.00 $5.00 $255.00
$50,000 $370.00 $7.40 $377.40
$75,000 $520.00 $10.40 $530.40
$101,667 and above $680.00 (cap) $13.60 $693.60

These figures are for the building permit alone. If trade permits (electrical, mechanical, plumbing) are required for the same project, each trade permit carries the same formula and its own 2% state levy. Source: henrico.gov/bldg/permit-fees/, verified April 16, 2026.

Worked Examples

Example 1: Deck Permit ($15,000 construction value)

Fee Calculation - $15,000 Deck in Henrico County, VA
Fee Component Rule Applied Amount
Base fee (covers first $5,000) $100 minimum $100.00
Incremental fee ($10,000 over threshold) 10 x $6 $60.00
Building Permit Fee (before levy) $100 + $60 $160.00
USBC State Levy $160 x 2% $3.20
Total - Building Permit Only $160 + $3.20 $163.20

Note: The $163.20 covers the building permit only. If the deck includes electrical work (lighting, outlets), an electrical permit is required separately using the same formula - for a $15,000 deck this adds another $163.20, bringing the total to $326.40. Construction value is based on cost of labor and materials declared at application. Source: henrico.gov/bldg/permit-fees/, verified April 16, 2026.

Example 2: Room Addition ($30,000) with Electrical and Plumbing Trade Permits

Fee Calculation - $30,000 Room Addition with Trade Permits in Henrico County, VA
Fee Component Rule Applied Amount
Building Permit - Addition $100 + (25 x $6) $250.00
USBC State Levy (building) $250 x 2% $5.00
Electrical Permit (same formula) $100 + (25 x $6) = $250 + levy $255.00
Plumbing Permit (same formula) $100 + (25 x $6) = $250 + levy $255.00
Estimated Total (building + 2 trades) $255 + $255 + $255 $765.00

Note: Trade permits for existing residential work use the same $100 + $6/$1,000 formula as the building permit, based on the same declared construction value. If mechanical (HVAC) or gas work is included, add another $255 each. Source: henrico.gov/bldg/permit-fees/, verified April 16, 2026.

Example 3: New Single-Family Dwelling (all permits)

Fee Calculation - New Single-Family Home in Henrico County, VA
Fee Component Rule Applied Amount
Building Permit - New SFD Flat $680 $680.00
USBC State Levy (building) $680 x 2% $13.60
Electrical Permit (new construction) Flat $100 + 2% levy $102.00
Mechanical/HVAC Permit (new construction) Flat $100 + 2% levy $102.00
Plumbing Permit (new construction) Flat $100 + 2% levy $102.00
Estimated Total (building + 3 trades) $693.60 + $102 + $102 + $102 $999.60

Note: This example covers the four core permits for new residential construction. Inspection surcharge fees ($75 per inspection exceeding average of 33) may add costs during the inspection phase for new construction. Fire suppression system permits, elevator permits, and other specialty permits would add to this total. Source: henrico.gov/bldg/permit-fees/, verified April 16, 2026.

Practitioner Insight

Henrico County's value-based formula sits between Fairfax County's higher percentage formula and Chesterfield County's flat fees. For a $15,000 deck: Fairfax costs $688.50, Henrico costs $163.20, Chesterfield costs $166.28, and neighboring Richmond City costs $144.75 under its $63 + $6.07/$1,000 formula. The Richmond MSA jurisdictions cluster within $22 of each other at mid-sized project values - but they diverge sharply as project cost rises. A $50,000 addition in Henrico costs $377.40 in building permit fees; the same project in Chesterfield remains $456.98 (building + env. engineering fee), while Richmond scales to $361.45 and Fairfax climbs significantly higher.

One important nuance specific to Henrico: trade permits for existing residential work follow the same $100 + $6/$1,000 formula as the building permit. This means a large addition with electrical, mechanical, and plumbing all declared at $30,000 each generates $765.00 in permit fees - more than the building permit alone. When budgeting for a full addition, count each required trade permit as a separate line item equal to or near the building permit cost. The $680 cap applies to each permit separately, not in aggregate.

Permit Requirements - Common Residential Projects in Henrico County

Project Type Permit Required? Building Permit Fee ($15k value) Notes
Deck (attached) Yes $163.20 Add electrical permit if wiring included
Room addition Yes $163.20 (at $15k) Trade permits required separately for wiring, plumbing, HVAC
Garage (detached) Yes $163.20 (at $15k) Electrical permit required if wiring planned
Shed Yes (consult dept.) $102.00 (at $5k or less) No size-based exemption listed; contact Building Inspections
Swimming pool (in-ground) Yes Based on declared value Barrier/fencing may require separate permit
Swimming pool (above-ground) Yes Based on declared value Consult Building Inspections for threshold
Porch addition Yes $163.20 (at $15k) Same formula as other appurtenances
Demolition Yes Based on declared value Listed explicitly in building permit scope
HVAC replacement Mechanical permit Based on declared value Trade permit only - no building permit needed
Electrical service upgrade Electrical permit Based on declared value Trade permit only - no building permit needed
New single-family home Yes $693.60 (flat $680 + levy) Plus 3 trade permits at $102 each; inspection surcharge may apply

Shed permit requirements - including any size-based exemptions - are not explicitly detailed in the published fee schedule. Contact Henrico County Building Inspections at (804) 501-4360 before beginning any shed project to confirm current permit thresholds and applicable fees.

Henrico County Building Construction and Inspections

Department

Department of Building Construction and Inspections

Henrico County Government

Phone

(804) 501-4360

Building Inspections main line

(804) 501-7280

Permit Center

Address

4301 East Parham Road

Henrico, VA 23228

Online Portal

Build Henrico

Applications and fee payments processed online through the Build Henrico permitting portal

Verify current fees with Henrico County Building Construction and Inspections before budgeting or filing. The fee formula published at henrico.gov/bldg/permit-fees/ was last updated December 17, 2025. No explicit fiscal year effective date is stated. Contact Building Inspections at (804) 501-4360 or the Permit Center at (804) 501-7280 to confirm current rates before submitting an application.

When This Estimate May Not Apply

No explicit fee schedule effective date

The official Henrico County permit fee page is labeled "Current" but does not state a fiscal year effective date or rate adoption date. The page was last updated December 17, 2025. Always verify the current formula directly with Building Inspections before budgeting, especially if the rates affect a significant project.

Shed permit requirements not detailed

Henrico's fee schedule lists sheds as covered under the existing residential formula but does not specify whether a size-based exemption exists (as in Chesterfield County's 256 sq ft rule). The fee formula applies to any shed requiring a permit, but the threshold for when a permit is required is not published on the fee page. Contact Building Inspections before beginning shed construction.

New construction inspection surcharges

New one- and two-family dwelling construction is subject to a $75 inspection surcharge per inspection exceeding the county average (33 for homes without fire suppression, 40 with fire suppression). These surcharges are not predictable at application time and are not included in any worked examples on this page.

Construction value declaration

The permit fee is calculated on the declared construction value at application. If the declared value is revised during review - for example, if Building Inspections determines the declared value does not reflect actual cost of labor and materials - the permit fee will change accordingly.

Commercial or multi-family construction

This page covers the residential fee formula (one- and two-family dwellings) only. Commercial buildings in Henrico County use a different formula: $100 + $7.00 per $1,000 over $5,000 with no stated maximum. Do not apply residential rates to commercial or multi-unit construction.

Frequently Asked Questions

Henrico County residential building permit fees are based on the declared construction value: $100 for projects up to $5,000, plus $6 per additional $1,000 or fraction thereof. The maximum fee is $680. Virginia's mandatory 2% USBC state levy is added. For a $15,000 deck: $160 permit fee + $3.20 levy = $163.20. For a $30,000 addition: $250 + $5.00 = $255. New construction is a flat $680 + $13.60 levy = $693.60.
For existing one- and two-family dwelling work (decks, additions, porches, sheds, garages, pools, and other appurtenances): permit fee = $100 + ($6 x each $1,000 of construction value over $5,000, rounding fractions up). Maximum fee: $680. For new one- and two-family dwelling construction: flat $680. In both cases, add 2% state levy at payment. This formula applies to both the building permit and trade permits (electrical, mechanical, plumbing) for existing residential work.
The maximum building permit fee for a residential permit is $680. This cap is reached at approximately $101,667 in declared construction value. Above that threshold, any project pays the same $680 building permit fee plus the 2% state levy, for a total of $693.60. The cap applies to each permit separately - if a project also requires trade permits (electrical, mechanical, plumbing), each permit follows the same formula with its own $680 cap.
For a $15,000 deck: Fairfax County costs $688.50 (Verified, FY2025 Appendix Q formula); Chesterfield County costs $166.28 (Verified, flat fee + env. engineering fee); Henrico County costs $163.20 (Verified, value-based formula). For a $50,000 addition: Fairfax would significantly exceed $1,000 in building permit fees; Chesterfield stays at $456.98; Henrico costs $377.40. For very large projects over $101,667, Henrico's fee caps at $680, which can be far less than Fairfax's uncapped percentage formula. See Fairfax County fees and Chesterfield County fees for full comparisons.
Yes, for existing one- and two-family dwelling work. Electrical, mechanical (HVAC), and plumbing permits all use the same formula as the building permit: $100 + $6 per $1,000 of declared construction value over $5,000. Each carries its own 2% state levy. For new one- and two-family construction, trade permits are each a flat $100 (plus 2% levy), not value-based. This means a full renovation with building, electrical, and plumbing permits at the same declared value generates three permit fees using the same calculation.
Henrico County processes residential permit applications through Build Henrico, the county's online permitting portal. You can register, submit applications, upload required documents (site plans, construction plans, structural framing details, DPW forms, Owner's Statement of Responsibility), and pay fees online. For in-person assistance, visit the Department of Building Construction and Inspections at 4301 East Parham Road, Henrico, VA 23228. Office hours are Monday-Friday 8:00 a.m. to 4:30 p.m. Call (804) 501-4360 for Building Inspections or (804) 501-7280 for the Permit Center.

Sources

Official .gov Sources - Verified April 2026
Next Step

Compare Henrico County against Fairfax County and Chesterfield County, or calculate your specific project cost.

Deck Permit Cost Guide → Virginia Permit Cost Guide → Chesterfield vs Henrico Comparison → Henrico vs Richmond Comparison → Fairfax vs Henrico Comparison → Henrico Pool Permit Guide → All Guides → Compare Jurisdictions →

Permit Fees Are One Part of Your Project Budget

Once you know your Henrico County permit cost, two related numbers complete your total budget picture:

Property tax impact after your project closes

A permitted deck or addition increases your assessed value in Henrico County. See how each Virginia jurisdiction calculates the ongoing property tax impact at CountyTaxTools.com.

Zoning review and development impact fees

Development impact fees and zoning costs in Henrico County can add significant cost to major additions and new construction. Research them at ZoneFee.com.

Always verify current fees directly with Henrico County Department of Building Construction and Inspections before budgeting or filing. The fee formula at henrico.gov/bldg/permit-fees/ was last updated December 17, 2025 and does not state an explicit fiscal year effective date. Call (804) 501-4360 or (804) 501-7280, or visit the department at 4301 East Parham Road, Henrico, VA 23228, to confirm current rates before submitting an application.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by Henrico County Department of Building Construction and Inspections at the time of application. Fee schedules, surcharge rates, and permit requirements can change without notice. The absence of an explicit fee schedule effective date on the official source page is a disclosed limitation - verify current rates with the building department before filing.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.